A load bank is a piece of electrical test equipment used to simulate an electrical load to test an electric power source without connecting it to its normal operating load.
Generator load bank testing equipment.
This is especially important for standby and emergency generator sets that do not run very often and or may not be exposed to carrying heavy loads on a frequent basis.
A variety of industries use backup generators to guard against the adverse impact of inevitable utility service interruptions.
Portability makes this ideal for testing smaller applications.
Load bank testing involves firing up a standby or prime power generator and running it under an artificial load at its maximum capacity for a specified period of time.
Load bank testing shall be performed for a period of four 4 hours at the full rated load of the generator and witnessed by a county representative.
A load bank is a device which develops an electrical load applies the load to an electrical power source and converts or dissipates the resultant power output of the source.
What type of generator load bank testing equipment should i use.
1 000 amps of load at 500vdc or 1 000 vdc.
Routine load bank testing is essential for insuring proper working order of your facilities critical backup generator systems.
Read more about load bank fundamentals at simplex.
At some point in the life of mission critical electrical systems operators will experience outages resulting from system interruption or partial interruption.
Prechecks 1 fuel fluid levels belts hold down bolts etc.
Can be used to test 750 vdc transit system power systems.
The equipment used to conduct a load bank test produces artificial loads on the generator by bringing the engine to an appropriate operating temperature and pressures.
The frequency schedule for load bank testing on a generator often depends on how the generator is classified and what it is a standby for.
For example if a generator is used as a backup for services associated with loss of life or serious injury such as in a hospital setting the testing requirements are much more frequent.
During testing adjustment calibration or verification procedures a load bank is connected to the output of a power source such as an electric generator battery servoamplifier or photovoltaic system in place of its.
Necessary precautionary measures should be considered to enhance safety and prevent potential damages to the system.
During load bank testing data can be recorded that offers a more thorough look into the health of the gen set on the whole.
Common load bank for testing 480 vdc battery strings or 750 vdc power supplies.
For generator load bank testing to be carried out in your systems it entails hiring equipment if you ve large systems pay engineer time and pay for temporal cable provision and connection.
Mv multi voltage and phase units are rated at the full kw capacity at 480 240 vac 3 phase and 75 of the ratings at 208 120 vac 3 phase.
Generator engine and load bank testing outline a.
2 run generator long enough to establish proper operation and make sure all.